Delivery Quantity Capture for Product Allocations
Problem: When orders consume Allocations, partial delivery quantities do not update the Allocation consumption to show that there are still units available to consume.
Solution: The delivered quantities will be posted into the Allocation tables and update the Incoming Order consumption quantities so that the true Allocation consumption is reflected.
Flexible Period Allocation Distribution
Problem: Requirement from forecast, marketing or production requires a flexible distribution of periods in product Allocation between organizations. Standard SAP just enable period handling in a limited way.
Solution: Enable the use of a combination of organization schemes according to marketing, production or forecast with great flexibility in backward, present or forward consumption (not available in Allocations). The application of complex schemes is limited by SAP, this accelerator overcomes the limitation.
Combination of Basic Methods and Production
Problem: SAP triggers the execution of Production either after analyzing the GATP basic methods or without considering them at all, this has the limitation of having a possible confirmation from both sources in an earlier date than the one determined by either procedure.
Solution: This accelerator enables the system to decide which is the best available date provided by the results from BOTH procedures – basic methods and production.
